Customer support:722 702 122info@p-t.store
Currency
EUR
Language
English

AV System Grounding

Grounding systems offer an AV upgrade through dedicated grounding cables and units. Innovative US company Nordost is a leading specialist in this field, offering advanced products.

Bestsellers

Was: €20,10  (–53 %)
€9,40
Nordost QKore Wire PREMIUM grounding cable + doprava zdarma
On request - delivery date to be specified
10723/2/ZLA/ZLA
 
from €521,40
Nordost QKore Wire grounding cable + doprava zdarma
On request - delivery date to be specified
QKW2MB-B
 
from €418,70

Product sorting

4 items total

List of products

Lithe Audio uzemnění 2 x RCA Jack 3,5mm
Action
€20,10 –53 %
€9,40 / pcs
Measure price: €9,40 / 1 pcs

Noise elimination when connecting devices via RCA to Lithe speakers.

01276S
Nordost QKore wire PREMIUM zemnící kabel (1)
FREEFREE
Nordost QKore Wire PREMIUM grounding cable + doprava zdarma
On request - delivery date to be specified
from €521,40 / pcs
Measure price: from €521,40 / 1 pcs

2-meter grounding cable PREMIUM for QKore units, any connectors on one side. Option for flexible selectable connectors.

10723/2/ZLA/ZLA
Nordost QRT qkore (2)
FREEFREE
Nordost QKore Wire grounding cable + doprava zdarma
On request - delivery date to be specified
from €418,70 / pcs
Measure price: from €418,70 / 1 pcs

2-meter grounding cable for QKore units, any connectors on one side. Option for flexible selectable connectors.

QKW2MB-B
Nordost QRT qkore
Tip
FREEFREE
from €2 785,10 / pcs
Measure price: from €2 785,10 / 1 pcs

Effective concurrent grounding device, primary grounding of the Nordost QB power strip, and secondary grounding for components.

A-QKORE-1

Listing controls

4 items total

Connecting grounding accessories

Choose grounding accessories according to the component and grounding system manufacturers' instructions. Check the designated connection points and compatible cables. Signal grounding or supplementary grounding does not replace the electrical installation's protective earth. When investigating hum, first review the system connections and never disconnect equipment's protective earth.